Electircal Works For 5 Nos. Network Pumping Station @ Jinjang and Kepong

ProjectCONSTRUCTION OF NEW NETWORK PUMPING STATION INCLUDING TESTING & COMMISSIONING, DEMOLITION & RATIONALIZATION OF EXISTING SEWERAGE TREATMENT PLANTS AT JINJANG KEPONG, KUALA LUMPUR
ServicesSUPPLY, DELIVERY, INSTALL, TESTING & COMMISSIONING ELECTRICAL AND CONTROL INSTRUMENTATION CABLING WORKS
OwnerJABATAN PERKHIDMATAN PEMBETUNGAN
CompletionJULY 2017 – IN PROGRESS
JV PartnerPROTECH BUILDERS SDN. BHD.

Electrical MV, LV and Fire Alarm System for Sub-Station at Hatchery Plant @ Lumut

ProjectPROPOSED EXTENSION FOR HATCHERY BUILDING ON PARTIAL LOT PT 13525, BATU UNDAN, MUKIM LUMUT, DAERAH MANJUNG, PERAK DARUL RIDZUAN FOR DINDINGS POULTRY DEVELOPMENT CENTRE SDN BHD
ServicesDESIGN, SUPPLY, DELIVERY, INSTALL, TESTING & COMMISSIONING OF 11kV INTERCONNECTION INCLUDING 11kV SWITCHGEARS, TRANSFORMERS, GENSET, LV MAIN SWITCH BOARDS TO EXISTING MAIN POWER
OwnerDINDINGS POULTRY DEVELOPMENT CENTRE SDN BHD
CompletionAUGUST 2018 – DECEMBER 2018

Mini Hydro – 33kV ABC Overhead Cable, Poles and Accesories @ Kerian, Perak

ProjectKERIAN MINI HYDRO 14MW PROJECT – RECTIFICATION OF 33kV ABC OVERHEAD CABLE, POLES & ACCESORIES
ServicesRECTIFY EXISTING 33kV OVERHEAD TRANSMISSION LINE ABC CABLINGS (12KM) ON 10m CONCRETE POLES FROM HYRDO PLANT TO 33kV TNB PPU INCLUDING 33kV STRAIGHT THROUGH JOINTS & OUTDOOR 33kV TERMINATIONS
OwnerWATER ENGINEERING TECHNOLOGY SDN. BHD.
CompletionMARCH 2018 – JUNE 2018

1MW Sanitary Landfill Biogas Plant @ Jeram, Selangor

ProjectDEVELOPMENT OF 1MW RENEWABLE ENERGY POWER GENERATION PLANT (GAS ENGINE) USING LANDFILL GAS AT JERAM SANITARY LANDFILL, SELANGOR
ServicesDESIGN, SUPPLY, DELIVER, INSTALL, TESTING & COMISSIONING OF 11kV INTERCONNECTION INCLUDING 11kV SWITCHGEARS, TRANSFORMER, 11kV UNDERGROUND CABLING, FIBER OPTIC & SCADA SYSTEM.
OwnerJANA LANDFILL SDN. BHD.
CompletionJANUARY 2018 – AUGUST 2018
JV PartnerPROTECH BUILDERS SDN. BHD.

700kWp Solar PV System @ Setia Welcome Centre

AP1 AP2 AP.JPG  AP4

Project: 11kV INTERCONNECTION OF 700kWp SOLAR PV SYSTEM AT SETIA WELCOME CENTRE FOR ECO MERIDIAN SDN. BHD.
Services: SUPPLY, DELIVERY, INSTALL, TESTING & COMMISSIONING OF 11kV INTERCONNECTION INCLUDING 11kV SWITCHGEARS, TRANSFORMER, 11kV UNDERGROUND CABLING (350m), FIBER OPTIC & INTERLOCKING SYSTEM.
Owner: Eco Meridian Sdn. Bhd. / Pekat Solar Sdn. Bhd.
Completion: June 2016 – December 2016

1 MW Solar Farm @ Kota Marudu

1 2 3  4

Project: 1 MW Solar Farm @ Kota Marudu For Diamond Uptown Sdn. Bhd. Upgrading Works For Loop In Loop Out At P/E Korongkom
Services: Supply, Install, Testing & Commissioning Of 11kV Interconnection Including 11kV Underground Cabling, LV Underground Cabling, Transformer Underground Cabling, Relocation & Retermination Of LV Feeder Pillar & Transformers & 11kV & LV Pole Planting.
Owner: Diamond Uptown Sdn. Bhd.
Completion: December 2015 – January 2016

1MW Solar Farm @ Sekinchan

Project: 11KV Interconnection Of 1.0 MW Solar PV Farm At Sekinchan For Sai Kim Enterprise Sdn. Bhd.
Services: Installation Of 11kV Interconnection For 11kV Switchgears, Transformer, LV Main Switchboard, 11kV Underground & Fiber Optic Cables, Including Supply And Install AC Cablings Works From Inverter To LV Main Switch Board And Lightning & Earthing System For Solar Farm.
Owner: Sai Kim Enterprise Sdn. Bhd.
Completion: November 2015- December 2015

2MW Biogas Plant @ Kahang

WhatsApp-Image-20160721 (1)  WhatsApp-Image-20160721 (2)WhatsApp-Image-20160721 (3) WhatsApp-Image-20160721 (4)

Project: 11KV INTERCONNECTION OF 2.0 MW BIOGAS POWER PLANT AT KAHANG, JOHOR FOR GREEN & SMART SDN. BHD.
Services: SUPPLY, DELIVERY, INSTALL, TESTING & COMMISSIONING OF 11KV INTERCONNECTION INCLUDING 11KV SWITCHGEARS, TRANSFORMERS, LV MAIN SWITCH BOARDS, 11KV OVERHEAD ABC CABLINGS ON 10m CONCRETE POLES (650m), LV UNDERGROUND CABLINGS TO 2 UNITS BIOGAS GENERATORS, FIBER OPTIC & INTERLOCKING SYSTEM.
Owner: Felda Palm Industries Sdn. Bhd. / Green & Smart Sdn. Bhd.
Completion: October 2015 – December 2016

11MW Biomass Power Plant @ Batu Pahat

Project: 11kV Interconnection of 11MW Biomass Power Plant at Batu Pahat, Johor For Bell Eco Power Sdn. Bhd.
Services: Supply, Delivery, Install, Testing & Commissioning of 12.5 MVA Power Generation Transformer and 9.5km 11kV Overhead ABC cables Including Couple “New” VCB Panel With “Existing” VCB Panels at TNB 132kV Sub-Station.
Owner: Bell Eco Power Sdn. Bhd.
Completion: May 2015- In Progress

Government Lead By Example (GLBE) Off Grid Solar PV System @ Putrajaya

Project: 12kW to 48kW of Solar PV Systems for 25 Selected Putrajaya Government Buildings for a Total Capacity of 600kW Peak Solar Power Generation.
Services: Consultancy Services To Conduct Site Survey, Preparation of Design Drawing & Tender Document and Project Management for Sustainable Energy Development Authority (SEDA).
Owner: Kementerian Tenaga Teknologi Hijau Dan Air (KETHHA)
Superintending Officer: Sustainable Energy Developement Authority Malaysia (SEDA)
Completion: June 2014- June 2015

10MW Rice Husk Biomass Plant @ Cambodia

logo_pmt

Project: Electrical Consultancy Services for 10MW Rice Husk Biomass Plant @ Cambodia.
Services: To Design and Prepare Tender Documentation for Medium Voltage Interconnection, Medium Voltage Switchgears, 15MVA Power Generation Transformer, Complete LV Distribution System Including Switch Boards, Distribution Boards & Cabling Works, Lighting & Small Power and ELV Services i.e. CCTV, Access Control, Public Address & Telephone Services.
Owner: PMT Energy Sdn. Bhd.
Completion: May 2015- In Progress

1MW Solar Farm @ Kota Marudu

Project: Proposed 11kV Interconnection of 1MW Solar Farm In Kota Marudu, Sabah for Diamond Uptown Sdn. Bhd.
Services: Supply, Delivery, Install of 11kV Interconnection for 1MW Building Intergrated Photovoltaic (BIPV) System.
Owner: Diamond Uptown Sdn. Bhd.
Completion: October 2014- February 2015

2MW Solar Farm @ Puchong Gateway

Project: Proposed 11kV Interconnection of 2 MW Solar PV at Puchong Gateway for Solar System & Power Sdn. Bhd.
Services: Supply, Delivery, Install of 11kV Interconnection Including 11kV Switchgears, Transformers, LV Main Switch Boards, 11kV Underground Cabling, Fiber Optic & Interlocking System.
Owner: Solar System & Power Sdn. Bhd.
Completion: August 2014-December 2014